Projects

MSBA Accelerated Repair Projects
Category: Public K-12 Schools Upgrades
MSBA Accelerated Repair Projects image MSBA Accelerated Repair Projects image MSBA Accelerated Repair Projects image

Chicopee Public Schools

  • Names of Projects: Patrick Bowe Elementary School and Selser Academy at Chicopee
  • Architect: Turowski Architecture
  • General Contractor: TBD
  • Size: 20,000 SF roof replacement and full window and door replacement
  • Construction Cost: $3.6M / Project Cost: $4.8M
  • Start of Construction: February 2018 (estimated)
  • Date of Completion: September 2018 (estimated)
  • Special LEED Features: Energy efficient low E glass windows and doors, added roof insultion
  • General Overview: Replacement of all windows and exterior doors at the Bowe School, masonry façade repairs, roof replacement with PVC sarnafil roof, new efficient exhaust fans, inclusion of an ADA bathroom upgrade.

 

Topsfield Public Schools

  • Names of Projects: Proctor Elementary School and Steward Elementary School
  • Architect: SLAM Collaborative
  • General Contractor: TBD
  • Size: TBD
  • Construction Cost: TBD / Project Cost: TBD
  • Start of Construction: February 2018 (estimated)
  • Date of Completion: September 2018 (estimated)
  • Special LEED Features: Added roof insulation, new high efficiency roof top HVAC units, some new energy efficient low E glass windows and doors
  • General Overview: Full roof replacement at each school including new efficient exhaust fans and new high efficiency roof top HVAC units. Replacement of some windows and doors at each school, inclusion of an ADA bathroom upgrade.

 

North Reading Public Schools

  • Name of Project: E. Ethel Little Elementary School
  • Architect: HAKS Inc.
  • General Contractor: Stanley Roofing
  • Size: 40,000 SF
  • Construction Cost: $1.3M / Project Cost: $1.8M
  • Start of Construction: June 2016
  • Date of Completion: October 2016
  • Special LEED Features: Added roof insulation
  • General Overview: Replacement of complete roofing assembling with an SBS built up roofing system and energy code insultion, replacement of skylight, roof hatch, masonry through wall flashing.

 

Fitchburg Public Schools

  • Name of Project: Goodrich School, Reingold School, Fitchburg High School, Memorial School, South Street School
  • Architect:  KBA Architects & BLW Engineers
  • General Contractor: Lockheed Windows; Rockwell Roofing, E. Amanti & Sons, CAM HVAC & Construction
  • Size (sf): NA
  • Construction Cost: $7.2 million ($9.0 million project cost)
  • Start of Construction: February 2011
  • Date of Completion: January 2013
  • Special LEED Features: New energy efficient low E glass windows & doors, added roof insulation, Energy Efficient gas boilers & new controls.
  • General Overview of Project: Replaced the windows and doors at 3 schools in the District. Replaced roof with added insulation at 2 schools in the district.  Replace antiquated boilers with new gas fired energy efficient boilers including replacement piping and new automated temperature controls in 5 schools in the district.

 

Sudbury Public Schools

  • Name of Project:  Peter Noyes School Roof Replacement
  • Architect:  Russo Barr Associates & BLW Engineers
  • General Contractor: Lockheed Windows; Gibson Roofing, E. Amanti & Sons,
  • Size (sf): NA
  • Construction Cost: $2.0 million ($2.4 million project cost)
  • Start of Construction: May 2011
  • Date of Completion : November 2011
  • Special LEED Features: New energy efficient low E glass windows & doors, added roof insulation, Energy Efficient gas boilers & new controls.
  • General Overview of Project: Replaced all windows and doors in the school, Replaced roof with added insulation, new access ladders & skylights.  Replace antiquated boilers with new gas fired energy efficient boilers including replacement piping and new automated temperature controls.

 

Weston Public Schools

  • Name of Project: Weston High School Boiler Replacement
  • Architect:  Garcia Galuska DeSousa
  • General Contractor: E. Amanti & Sons,
  • Size (sf): NA
  • Construction Cost: $810,000 ($1.0 million project cost)
  • Start of Construction: May 2012
  • Date of Completion : November 2012
  • Special LEED Features: New Energy Efficient gas boilers & new controls.
  • General Overview of Project: Replace antiquated boilers with new gas fired energy efficient boilers including replacement piping and new automated temperature controls.

 

  • Name of Project:Weston Middle School Roof Replacement
  • Architect: Russo Barr Associates, Inc.
  • General Contractor: Greenwood Industries Inc.
  • Size (sf): 34,000 sf.
  • Construction Cost: $ 522,917 final
  • Start of Construction: June 2011
  • Date of Completion: August 2011
  • Special LEED Features: NA
  • General Overview of Project: Partial roof replacement, general scope included completely removing the existing roofing systems and replacing with new insulation, reinforced fully adhered EPDM, metal coping, skylights, access ladders, guardrails and new roof drains.

 

North Middlesex Regional School District

  • Name of Project: Ashby Elementary School, Ashby MA - Roof Replacement
  • Architect:  Russo Barr Associates
  • General Contractor: Greenwood Industries, GVW Inc.,
  • Size (sf): NA
  • Construction Cost: $1.2 million ($1.5 million project cost)
  • Start of Construction: October 2011
  • Date of Completion: September 2012
  • Special LEED Features: New energy efficient low E glass windows & doors, added roof insulation,
  • General Overview of Project: Replaced all the windows and doors in the school, Replaced roof with added insulation; new access ladders.

 

  • Name of Project: Spaulding Memorial Elementary School, Townsend, MA - Roof Replacement
  • Architect:  Russo Barr Associates
  • General Contractor: MDM Engineering,
  • Size (sf): NA
  • Construction Cost: $860,000 ($1.1 million project cost)
  • Start of Construction: March 2012
  • Date of Completion: July 2012
  • Special LEED Features: added roof insulation,
  • General Overview of Project: Replaced 80 year old slate roofing with copper features with new slate and copper, beautiful new copper bull’s-eye dormers; replaced PVC roofing with added insulation new access ladders & railings.

 

Leominster Public Schools

  • Name of Project: Southeast Elementary School Boiler and Roof Repair Project,, Fall Brook Elementary Boiler Repair Project
  • Architect: Reinhardt Associates
  • General Contractor: NB Kenney Company, Inc., Silktown Roofing, Inc.
  • Size (sf): NA
  • Construction Cost (estimated or final): Est.$3,536,000
  • Start of Construction: May 2013
  • Estimated Date of Completion: October 2013
  • Special LEED Features: NA
  • General Overview of Project: The Southeast Elementary roof replacement project consists of the removal of the existing SPM and asphalt shingles roofing systems down to the existing roof decks and installation of new roof insulation, single ply membrane and asphalt shingle roofing and flashing systems. The Boiler Replacement at the Southeast and Fall Brook Elementary Schools consists of general demolition, removal and replacement of the existing boiler systems and associated Plumbing, HVAC and Electrical.